Specifications
Boiler installation sequence
24 Instructions for installation and servicing ecoTEC 839592_13
4
> The boiler can be correctly flued, i.e. the flue terminal
position is located in accordance with these instruc-
tions and the air/flue duct can be installed in accord-
ance with the flue installation instructions supplied.
> All necessary pipework can be connected, including
the pressure relief valve and condensate drain.
4.2.2 Unpack the boiler
To unpack the boiler, cut both plastic carton straps, open
bo
x and lift out the polystyrene top packing. Lift the
cardboard box upwards.
i
Care should be taken not to scratch the white
surface of the boiler casing.
4.2.3 Using boiler template
60/100
256723_01 01 2005
5
95
165
25
180
20
175
5
45
A
A
A
A
A
1065
450
Fig. 4.2 Assembly template: example
> Fix the paper template to the wall ensure that the
template is vertical.
The template shows:
–
The position of the fixing holes for the boiler mount-
ing bracket.
– The position of the connections.
– The position of the flue exit hole.