Installation Guide
Installation instructions
Heat pump dryer
One-family household
1068340-R03
31/10/2019
1068340-R03
9
Washer-dryer towers
Fixed upright outflow pipe with separ-
ately routed drainage pipe
Fixed upright outflow pipe with combi
drainage set (W55969)
Work steps
≤700
≤700
▸ Can be connected to a concealed double
drain trap.
Max. pumping height: 700mm Max. pumping height: 700mm
7. Using for the first time
If the location of the appliance is changed, because of the heat pump it must stand in its final position for around 2
hours before it can be operated again. Failure to do this can result in damage to the appliance.
When the appliance is connected to the power supply for the first time, it is possible to carry out a function test. The purpose of the
function test is to check the installation. It takes about 3 minutes. As the heat pump is not tested, the function test can be started imme-
diately after installation. It cannot be aborted by interrupting the power supply. Once the function test has been run or aborted, it can
no longer be selected and the appliance enters the normal selection mode.
Carrying out the function test Interrupting the function test Aborting/skipping the function test
▸ Insert plug into mains socket.
– In the display appears: «Language:
English»
▸ Select language for function test.
▸ Touch .
– Appliance is ready for function test.
– In the display appears: «Function
test – Start with button
Skip with button »
▸ To start the function test, touch .
– The function test starts.
– In the display appears: «Function
test 0h03»
▸ To interrupt the function test, touch .
– In the display appears: «Function
test – Continue with button
Abort with button »
▸ To continue the function test, touch .
▸ To abort or skip the function test, touch
.
After the function test:
▸ Select the user language, see the operating instructions.
▸ Select viewing angle, see the operating instructions.
▸ Select V-ZUG-Home mode, see the operating instructions.









