User Manual

RPC/RP Configuration RPC/RP Manual
WLL-RPC/RP-IN/UM-1.0 19June2000
4-
42
Figure 4-45: File for Data Download Window
2. Select the data file to be downloaded. The data file must be of the .DAT or
.EEP type. When the Open button is clicked, a confirmation window opens.
Click OK. This opens the Service Data Download window, as shown in the
figure below.
Figure 4-46: Service Data Download Window
3. Select the target RPC to which to download the data. Make a selection in the
Operation Switch Timing block. If the Specified switch date radio button is
selected, specify the date and time for the switch operation to be executed.
Click OK. The operation data is downloaded to the SBY SDM.
4.3.4 Data Switch
Use the Data Switch option to specify the date and time to switch to the SBY
SDM.