User Manual
RPC/RP Manual RPC/RP Configuration
19June2000 WLL-RPC/RP-IN/UM-1.0
4-
41
1. From the Maintenance pull-down menu, select Program Download, and then
Program Switch. The Program Switch window appears, as shown in the
figure below.
Figure 4-44: Program Switch Window
2. This window is exactly the same as the previous one. Make a selection in the
Operation Switch Timing block. If you click the Specified switch date
radio button, specify the date and time for the new program to go into
operation. Click OK to accept the setting or Cancel to stop the transaction.
After switching at the specified time, RPC runs based on the SBY PDM and
each PDM status is switched.
4.3.3 Data Load
Operation data can be loaded and put into operation by selecting the Service Data
options. Use the procedure in this section to load the operation data to the SBY
SDM and to specify the time to switch to the new data.
1. From the Configuration pull-down menu, select Service Data, then Data
Download, and then Data load. This opens the File for Data Download
window, as illustrated in the figure below.