User Manual
RPC/RP Configuration RPC/RP Manual
WLL-RPC/RP-IN/UM-1.0 19June2000
4-
40
Figure 4-42: Download Confirmation Dialog Box
3. Click OK, and the Program Download window opens, as shown in the figure
below.
Figure 4-43: Program Download Window
Field Name Description
RPC The ID number of the RPC to which the program data are to be
downloaded. Click the Arrow button to make a selection.
Immediate switch after
loading
If selected, the RPC will switch to the new program data
immediately after downloading.
Specified switch date If selected, the RPC will switch to the new program data at the
date and time specified in the two fields provided.
Table 4-10: Program Download Window Field Description
4. Select the RPC to which the program data are to be downloaded, and make a
selection in the Operation Switch Timing block. Click OK. The program
data are downloaded to the SBY PDM.
5. After the data have been downloaded, click OK.
4.3.2 Program Switch
Use the Program Switch option to switch the operation status of the SBY PDM
and the ACT PDM.