Instructions / Assembly

MASTER CONTRACT: 263865
REPORT: 70030918
PROJECT: 80056731
Page No: 41
Date Issued: September 30, 2020
DQD 507.10 Rev 2020-07-02 © 2020 CSA Group. All rights reserved.
So the following tests were conducted on new construction of model GFT-10166E with use of the small burning
system, and satisfactory test results were obtained.
The following tests were conducted in:
CCIC-CSA International Certification Co. Ltd.
Guangzhou Science Park Lab, No. 10, Ke Yan Rd.,
Science Park of Guangzhou,
Guangdong,
CHINA 510000
Tests Data stored in Documentum.
ANSI Z21.97-2014 / CSA 2.41-2014 Outdoor Decorative Gas Appliances
Section 1 Scope
Section 4 Construction -partial
Section 5 Performance
5.1 General
5.2 *Test Gases
5.3 *Test pressures and burner adjustments
5.4 *Combustion
5.5 *Burner operating characteristics
5.6 Pilot operating characteristics NA. No Pilot.
5.7 Automatic gas ignition systems NA
5.8 Direct ignition systems NA, no direct ignition systems.
5.9 *Manual ignition systems
5.10 Manual operated gas valve NA, use certified type.
5.11 Gas appliance pressure regulators NA, no gas appliance pressure regulators
5.12 Automatic valves NA, no automatic valve.
5.13 Dual cylinder manifold NA, use one cylinder only
5.14 Manifold and gas control assembly capacity - NA
5.15 Wall, floor and ceiling temperatures Extended from model G-FTB-51032 of project 70030918
5.16 *Rain test
5.17 *Wind test
5.18 Burner durability
5.19 Glass panels NA, no glass panels.
5.20 Appliance structure -Extended from model G-FTB-51057B of project 70076502.
5.21 Orifice and orifice fitting temperatures -Extended from model G-FTB-51057B of project 70076502.
5.22 Marking material adhesion and legibility NA, permanent hanging tag.
5.27 ANSI Z21.89-2013/CSA1.18-2013 tag pulling test -Extended from model G-FTB-51057B of project
70076502.
Note: Tests with affix “*” also conducted with Natural Gas.
See main archive file for details of testing.
Construction Review: