Instructions / Assembly
MASTER CONTRACT: 263865
REPORT: 70030918
PROJECT: 80056731
Page No: 41
Date Issued: September 30, 2020
DQD 507.10 Rev 2020-07-02 © 2020 CSA Group. All rights reserved.
So the following tests were conducted on new construction of model GFT-10166E with use of the small burning
system, and satisfactory test results were obtained.
The following tests were conducted in:
CCIC-CSA International Certification Co. Ltd.
Guangzhou Science Park Lab, No. 10, Ke Yan Rd.,
Science Park of Guangzhou,
Guangdong,
CHINA 510000
Tests Data stored in Documentum.
ANSI Z21.97-2014 / CSA 2.41-2014 Outdoor Decorative Gas Appliances
Section 1 Scope
Section 4 Construction -partial
Section 5 Performance
5.1 General
5.2 *Test Gases
5.3 *Test pressures and burner adjustments
5.4 *Combustion
5.5 *Burner operating characteristics
5.6 Pilot operating characteristics – NA. No Pilot.
5.7 Automatic gas ignition systems – NA
5.8 Direct ignition systems – NA, no direct ignition systems.
5.9 *Manual ignition systems
5.10 Manual operated gas valve – NA, use certified type.
5.11 Gas appliance pressure regulators – NA, no gas appliance pressure regulators
5.12 Automatic valves – NA, no automatic valve.
5.13 Dual cylinder manifold – NA, use one cylinder only
5.14 Manifold and gas control assembly capacity - NA
5.15 Wall, floor and ceiling temperatures – Extended from model G-FTB-51032 of project 70030918
5.16 *Rain test
5.17 *Wind test
5.18 Burner durability
5.19 Glass panels – NA, no glass panels.
5.20 Appliance structure -Extended from model G-FTB-51057B of project 70076502.
5.21 Orifice and orifice fitting temperatures -Extended from model G-FTB-51057B of project 70076502.
5.22 Marking material adhesion and legibility – NA, permanent hanging tag.
5.27 ANSI Z21.89-2013/CSA1.18-2013 tag pulling test -Extended from model G-FTB-51057B of project
70076502.
Note: Tests with affix “*” also conducted with Natural Gas.
See main archive file for details of testing.
Construction Review: