Instructions / Assembly

MASTER CONTRACT: 263865
REPORT: 70030918
PROJECT: 80056731
Page No: 10
Date Issued: September 30, 2020
DQD 507.10 Rev 2020-07-02 © 2020 CSA Group. All rights reserved.
Ninobo Yongshen YD1.5-1/YD1.5-1A/ YD1.5-1D/YD1.5-1AP (CSA 1610337)
Foshan Xinghuo D1.5B (CSA 1557834)
Electrode Yangzhou Fine FC4-0309-001 (CSA 1815746)
Ningbo Yongshen ZH-294A (CSA 2166273)
Yangzhou Huaming A (CSA 2754953)
Ningbo Henghui ZH-398A, ZH-422A, ZH-575A (CSA 2166273)
Wire Haocheng 3575 (UL E227587) (INT)
Yangzhou Fongming 3071 (UL E315207) (INT)
Corrugated Tube Hangzhou Wanquan WQ-1/4 (CSA 1720285)
Laineng 100-2014-L (CSA 1675450)
Huimeite HMTB-1 (CSA 2385151)
Shanghai Shenfu 1/4” (CSA 1565294)
Shanghai Laineng 1/4” (CSA 1675450)
Natural Gas Assy: KSUN DH22 (CSA 2552810)
With QH1 3/8”. QDD (CSA 2417537)
Laite WH02 (CSA 70144065)
With KJ50A2 QDD (CSA 2288664)
Marking material: TIANYUE TY25A-125 (CSA 70044611)