Descriptive Report and Test Results MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Edition 1: September 10, 2015; Project 70030918 – Guangzhou Issued by Vincent Ou Edition 2: May 6, 2016; Project 70076502 – Guangzhou Prepared by Vincent Ou; Reviewed by Nicole Zeng Figure 484 to 673 were added. Report pages reissued Edition 3: February 28, 2017; Project 70113883 - Guangzhou Issued by Jeff Hu Report pages reissued Figure 674 to 1078 were added.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 2 Date Issued: September 30, 2020 Figure 1116 and 1147 were added. Edition 9: June 4, 2020; Project 80044390 - Guangzhou Prepared By: Vincent Ou Authorized By: Don Lan Figure 1148 to 1169 were added, Report pages reissued Edition 10: September 30, 2020; Project 80056731 - Guangzhou Prepared By: Vincent Ou Authorized By: Don Lan Figure 1170 to 1193 were added.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 3 Date Issued: September 30, 2020 GFT-30044 GFT-30132C GFT-10166E GFT-10234 GFT-10520 GFT-30021 GFT-30493 GFT-30522 GFT-30585 GFT-30603 GFT-30618 GFT-51030B GFT-60597 GFT-10177C GFT-30801 GFT-30132D GFT-30711 GFT-30692 GFT-30693 GFT-30653 GFT-30741 GFT-60640A GFT-60640 GFT-61333 GFT-10505 GFT-10505A GFT-87028 GFT-31269 GFT-61378 GFT-61378A GFT-61349 GFT-10640E GFT-61377 GFT-61378 GFT-30943 GFT-30943 GFT-15106 GFT-31231 GFT-10081E FS072 GF
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 4 Date Issued: September 30, 2020 GFT-97010 GFT-10149 GFT-15035 GFT-93062 GFT-80108 GFT-31202 GFT-61358 GFT-97032 GFT-31567 GFT-61464 GFT-31269B GFT-31269 GFT-61358 GFT-10505A GFT-51057T GFT-30801B GFT-31741 GFT-31604 GFT-31756 GFT-61623 GFT-10685 GFT-31555 GFT-10674C GFT-31757 GFT-68043R GFT- 10714C GFT- 10715B CO9011 CO9014 CO9015 CO9016 CO9017 9306 9438 9297 9296 9307 9375 9710 9362 9451 50,000 50,000 50,000 50,000 50,000 50,000 50,
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 5 Date Issued: September 30, 2020 The manufacturer is required to apply the following markings: • Products shall be marked with the markings specified by the particular product standard. • Products certified for Canada shall have all Caution and Warning markings in both English and French. Additional bilingual markings not covered by the product standard(s) may be required by the Authorities Having Jurisdiction.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 6 Date Issued: September 30, 2020 Project 80019131 – No alternation required. Moved from report no.70170918: • Add a screw at the bottom of cylinder rack to lock the cylinder. See figure no.1116 page 36 to 39 for detail. • Markings altered; • Instruction manual altered. Project 80044390 – No alteration required. Project 80056731 – No alteration required. DQD 507.10 Rev 2020-07-02 © 2020 CSA Group. All rights reserved.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 7 Date Issued: September 30, 2020 FACTORY TESTS Factory testing to be in accordance with the Quality Control manual in reference to Clause 6 of the above mentioned requirements. The submitter shall ensure that the following factory tests are conducted at the frequency specified and the results are documented and made available for review by CSA field services representatives: Test Test Fire Burner, Manifold & Control Assy.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 8 Date Issued: September 30, 2020 DESCRIPTION Notes: 1.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 9 Date Issued: September 30, 2020 Models using 380mm*380mm square fire bowl Models using 420mm*420mm square fire bowl GFT-97010/GTF-10149/GFT-15035/ GFT-93062/9710/9632/ GFT-80108/GFT-31202/GFT-61358 G-FTB51032/G-FTB51059/G-FTB51015BD/G-FP-71853C/ G-FTB-L-A02FT08/GFT-10513R/GFT-10667/GFT-31741/ GFT-31756/GFT-31757 5.0kg 5.0kg 6.5kg 6.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 10 Date Issued: September 30, 2020 Ninobo Yongshen Foshan Xinghuo YD1.5-1/YD1.5-1A/ YD1.5-1D/YD1.5-1AP (CSA 1610337) D1.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 11 Date Issued: September 30, 2020 INDEX Figure no. Description of the figures Project 70030918 Drawings of model G-FP-71853C 1. Fireplace assembly 2. Pedestal assembly 3. Pedestal frame 4. Pedestal 5. Ledge 6. Pedestal backbone 7. Pedestal slate-L 8. Pedestal slate-R 9. Pedestal slate-B 10. Stove assembly 11. Burner assembly 12. Burner soleplate 13. Burner 14. Tracheal support 15. Burner bracket 16. Screen 17. Basin 18.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 12 Date Issued: September 30, 2020 44. Tabletop assembly 45. Tabletop frame 46. Slate assembly 47. Backbone – L 48. Backbone – R 49. Backbone – B 50. Door assembly 51. Door 52. Door shaft assembly 53. Handle 54. Shaft 55. Doorstop 56. Side panel B 57. Burner cover 58. Cylinder seat assembly 59. Cylinder seat 60. Cylinder screw 61. Stop sheet 62. Stop screw 63. Cylinder stop wire 64. Stove assembly 65. Burner assembly 66.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 95. 96. 97. 98. 99. 100. 101. 102. 103. 104. 105. 106. 107. 108. 109. 110. 111. 112. 113. 114. 115. 116. 117. 118. 119. 120. 121. 122. 123. 124. 125. 126. 127. 128. 129. 130. 131. 132. 133. 134. 135. 136. 137. 138. 139. 140. 141. 142. 143. 144. 145. DQD 507.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 146. 147. 148. 149. 150. 151. 152. 153. 154. 155. 156. 157. 158. 159. 160. 161. 162. 163. 164. 165. 166. 167. 168. 169. 170. 171. 172. 173. 174. 175. 176. 177. 178. 179. 180. 181. 182. 183. 184. 185. 186. 187. 188. 189. 190. 191. 192. 193. 194. 195. 196. DQD 507.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 197. 198. 199. 200. 201. 202. 203. 204. 205. 206. 207. 208. 209. 210. 211. 212. 213. 214. 215. 216. 217. 218. 219. 220. 221. 222. 223. 224. 225. 226. 227. 228. 229. 230. 231. 232. 233. 234. 235. 236. 237. 238. 239. 240. 241. 242. 243. 244. 245. 246. DQD 507.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 247. 248. 249. 250. 251. 252. 253. 254. 255. 256. 257. 258. 259. 260. 261. 262. 263. 264. 265. 266. 267. 268. 269. 270. 271. 272. 273. 274. 275. 276. 277. 278. 279. 280. 281. 282. 283. 284. 285. 286. 287. 288. 289. 290. 291. 292. 293. 294. 295. 296. 297. DQD 507.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 298. 299. 300. 301. 302. 303. 304. 305. 306. 307. 308. 309. 310. 311. 312. 313. 314. 315. 316. 317. 318. 319. 320. 321. 322. 323. 324. 325. 326. 327. 328. 329. 330. 331. 332. 333. 334. 335. 336. 337. 338. 339. 340. 341. 342. 343. 344. 345. 346. 347. 348. DQD 507.10 Rev 2020-07-02 Page No: 17 Date Issued: September 30, 2020 Stove assembly Burner assembly Burner soleplate Burner (Deleted, please refer to figure no.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 349. 350. 351. 352. 353. 354. 355. 356. 357. 358. 359. 360. 361. 362. 363. 364. 365. 366. 367. 368. 369. 370. 371. 372. 373. 374. 375. 376. 377. 378. 379. 380. 381. 382. 383. 384. 385. 386. 387. 388. 389. 390. 391. 392. 393. 394. 395. 396. 397. 398. 399. DQD 507.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 400. 401. 402. 403. 404. 405. 406. 407. 408. 409. 410. 411. 412. 413. 414. 415. 416. 417. 418. 419. 420. 421. 422. 423. 424. 425. 426. 427. 428. 429. 430. 431. 432. 433. 434. 435. 436. 437. 438. 439. 440. 441. 442. 443. 444. 445. 446. 447. 448. 449. DQD 507.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 450. 451. 452. 453. 454. 455. 456. 457. 458. 459. 460. 461. 462. 463. 464. 465. 466. 467. 468. 469. 470. 471. 472. 473. 474. 475. 476. 477. 478. 479. 480. 481. 482. 483.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 21 Date Issued: September 30, 2020 498. 499. 500. 501. 502. 503. 504. 505. 506. 507. 508. 509. 510. 511. 512. 513. 514. 515. 516. 517. 518. 519. 520. 521. 522. 523. 524. 525. 526.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 22 Date Issued: September 30, 2020 548. 549. 550. 551. 552. 553. 554. 555. 556. 557. 558. 559. 560. 561. 562. 563. 564. 565. 566. 567. 568. 569. 570. 571.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 23 Date Issued: September 30, 2020 598. 599. 600. 601. 602. 603. 604. 605. 606. 607. 608. 609. 610. 611. 612. 613. 614. 615. 616. Burning system assembly Soleplate Burner – Round Hose support Type L gasket Screen Burner basin pan Control panel assembly Control panel Corrugated tube Igniter Thermocouple Electrode Valve Hose assembly Orifice Name plate 1 Name plate 2 Hang chain 617. 618. 619. 620. 621. 622. 623. 624. 625. 626. 627. 628.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 24 Date Issued: September 30, 2020 648. 649. 650. 651. 652. 653. 654. 655. 656. 657. 658. 659. Control panel assembly Control panel Corrugated tube Igniter Thermocouple Electrode Valve Hose assembly Orifice Name plate 1 Name plate 2 Hang chain 660. 661. 662. 663. 664. 665. 666. 667. 668. 669. 670. 671. 672. 673.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 693. 694. 695. 696. 697. 698. 699. 700. 701. 702. 703. 704. 705. 706. 707. 708. 709. 710. 711. 712. 713. 714. 715. 716. 717. 718. 719. 720. 721. 722. 723. 724.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 741. 742. 743. 744. 745. 746. 747. 748. 749. 750. 751. 752. 753. 754. 755. 756. 757. 758. 759. 760. 761. 762. 763. 764. 765. 766. 767. 768. 769. 770. 771. 772. 773.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 789. 790. 791. 792. 793. 794. 795. 796. 797. 798. 799. 800. 801. 802. 803. 804. 805. 806. 807. 808. 809. 810. 811. 812. 813. 814. 815. 816. 817. 818. 819. 820. 821. 822.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 837. 838. 839. 840. 841. 842. 843. 844. 845. 846. 847. 848. 849. 850. 851. 852. 853. 854. 855. 856. 857. 858. 859. 860. 861. 862. 863. 864. 865. 866. 867. 868. 869. 870. 871. 872. 873.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 885. 886. 887. 888. 889. 890. 891. 892. 893. 894. 895. 896. 897. 898. 899. 900. 901. 902. 903. 904. 905. 906. 907. 908. 909. 910. 911. 912. 913. 914. 915. 916. 917. 918. 919. 920. 921.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 933. 934. 935. 936. 937. 938. 939. 940. 941. 942. 943. 944. 945. 946. 947. 948. 949. 950. 951. 952. 953. 954. 955. 956. 957. 958. 959. 960. 961. 962. 963. 964. 965. 966. 967. 968. 969. 970. 971. 972.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 981. 982. 983. 984. 985. 986. 987. 988. 989. 990. 991. 992. 993. 994. 995. 996. 997. 998. 999. 1000. 1001. 1002. 1003. 1004. 1005. 1006. 1007. 1008. 1009. 1010. 1011. 1012. 1013. 1014. 1015.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 1029. 1030. 1031. 1032. 1033. 1034. 1035. 1036. 1037. 1038. 1039. 1040. 1041. 1042. 1043. 1044. 1045. 1046. 1047. 1048. 1049. 1050. 1051. 1052. 1053. 1054. 1055. 1056. 1057. 1058. 1059. 1060. 1061. 1062. 1063. 1064. 1065. 1066.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 1077. 1078. Page No: 33 Date Issued: September 30, 2020 Conversion Label – EN & FR Declaration Letter Project 70189001 Updated drawings – Others are extended from G-FTB-51057B of project 70076502 1079. G-FTB-51057B update drawings Instruction Manual 1080. 1081. 1082. 1083. 1084.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 34 Date Issued: September 30, 2020 Other drawings refer to model GFT-30132C 1110. Drawings of model GFT-30741 Other drawings refer to model GFT-30132C 1111. Drawings of model GFT-60640A Other drawings refer to model GFT-10166E 1112. Drawings of model GFT-10177C Other drawings refer to model G-FTB-68043 and GFT-10520 1113. GFT-10166E instruction manual-EN&FR 1114. GFT-10166E rating label-EN&FR 1115. Guarantee letter Project 80019131 1116.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 1152. 1153. 1154. 1155. 1156. 1157. 1158. 1159. 1160. 1161. 1162. 1163. 1164. 1165. 1166. 1167. 1168. 1169. Project 80056731 1170. 1171. 1172. 1173. 1174. 1175. 1176. 1177. 1178. 1179. 1180. 1181. 1182. 1183. 1184. 1185. 1186. 1187. 1188. 1189. DQD 507.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 1190. 1191. 1192. 1193. DQD 507.10 Rev 2020-07-02 Page No: 36 Date Issued: September 30, 2020 GFT-31741 rating labels-EN&FR GFT-31741 instruction manual-EN GFT-31741 instruction manual-FR Declaration Letter © 2020 CSA Group. All rights reserved.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 37 Date Issued: September 30, 2020 TEST HISTORY Project 70030918 The following tests were conducted in: CCIC-CSA International Certification Co., Ltd. No. 10, Ke Yan Road Science Park Guangzhou 510663 China Tests Data stored in Documentum.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 5.27 Page No: 38 Date Issued: September 30, 2020 Permanently attached marking tags - See main archive file for details of testing. Project 70076502 The following tests were conducted in: CCIC-CSA International Certification Co., Ltd. No. 10, Ke Yan Road Science Park Guangzhou 510663 China Tests Data stored in Documentum. This project is to update report no.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 39 Date Issued: September 30, 2020 This project is to update report No. 70030918 to add alternate construction models GFT-10062 / GFT-10513 / GFT-10520 / GFT-30015 / GFT-20014 / GFT-30026 / GFT-30044 / GFT-30132C; New models are sharing the same burner system with previous listed models', but has below differences: 1. Appearances and table size are different; 2.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Section 1 Scope Section 4 Construction -partial Page No: 40 Date Issued: September 30, 2020 Section 5 Performance 5.1 General 5.2 Test Gases 5.3 Test pressures and burner adjustments 5.4 Combustion –Extended from model G-FTB-51057B of project 70076502. 5.5 Bruner operating characteristics -Extended from model G-FTB-51057B of project 70076502. 5.6 Pilot operating characteristics – NA. No Pilot. 5.7 Automatic gas ignition systems – NA 5.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 41 Date Issued: September 30, 2020 So the following tests were conducted on new construction of model GFT-10166E with use of the small burning system, and satisfactory test results were obtained. The following tests were conducted in: CCIC-CSA International Certification Co. Ltd. Guangzhou Science Park Lab, No. 10, Ke Yan Rd., Science Park of Guangzhou, Guangdong, CHINA 510000 Tests Data stored in Documentum. ANSI Z21.97-2014 / CSA 2.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 42 Date Issued: September 30, 2020 Construction review performed with satisfactory results. Project 70207528 The following tests were conducted in: CCIC-CSA International Certification Co., Ltd. No. 10, Ke Yan Road Science Park Guangzhou 510663 China Tests Data stored in Documentum. This project is to update report no.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 43 Date Issued: September 30, 2020 5.13 Dual cylinder manifold – NA, use one cylinder only 5.14 Manifold and gas control assembly capacity - NA 5.15 Wall, floor and ceiling temperatures – Extended from model G-FTB-51032 of project 70030918 5.16 Rain test – NG only 5.17 Wind test – NG only 5.18 Burner durability – Extended from model G-FTB-51032 of project 70030918 5.19 Glass panels – NA, no glass panels. 5.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 44 Date Issued: September 30, 2020 The glass panels used on model GFT-97010 and GFT-93062 are to be removed. The clearances to combustible ceiling and walls for all models are reduced to 64”. GFT-80108, GFT-31202 and GFT-61358 are new models extended from model GFT-97010 except appearances are different, which will not affect the test results. Model GFT-60640 added in project 70207528 is changed as GFT-60640A.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 45 Date Issued: September 30, 2020 Guangzhou 510663 China Tests Data stored in Documentum. This is an original certification project to certify fireplace models GFT-97010, #9710, GFT-10149, GFT-15035, GFT-93062 and #9632. These 6 new models use the same burning system, same firebox, share similar design. They are all rectangular type fireplace with same shape, and the sizes are almost the same, only the appearances are different.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 46 Date Issued: September 30, 2020 CCIC-CSA International Certification Co., Ltd. No. 10, Ke Yan Road Science Park Guangzhou 510663 China ANSI Z21.97-2017 / CSA 2.41-2017 Outdoor Decorative Gas Appliances This project is to update report no. 70030918 to: 1. add lava rock mesh screen for all models using square type and round type fire bowl; 2.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 47 Date Issued: September 30, 2020 5.23 Burn hazard potential – NA, no glass panels 5.24 Marking material adhesion and legibility – Waived, use certified type Construction Review: Construction review performed with satisfactory results. Project 80056731 The following tests were conducted in: CCIC-CSA International Certification Co., Ltd. No. 10, Ke Yan Road Science Park Guangzhou 510663 China ANSI Z21.97-2017 / CSA 2.
MASTER CONTRACT: 263865 REPORT: 70030918 PROJECT: 80056731 Page No: 48 Date Issued: September 30, 2020 5.15 Wall, floor and ceiling temperatures – Extend from report no.70030918 5.16 Rain test – Extend from report no.70030918 5.17 Wind test 5.18 Burner durability – Extend from report no.70030918 5.19 Glass panels – NA, no glass panels 5.20 Glass fronts – NA, no glass panels 5.21 Appliance structure – Extend from report no.70030918 5.22 Orifice and orifice fitting temperatures – Extend from report no.