Installation Guide
4
Lowes.com
Before beginning installation of product, make sure all parts are present. Compare parts with package
contents list. If any part is missing or damaged, do not attempt to assemble the product.
Estimated Installation Time: 2 hours
Tools Required for Assembly (not included): Adjustable wrench, hacksaw, flathead screwdriver, Phillips
screwdriver, tape measure, utility knife, pipe wrench
Part Description Quantity
A Pump 1
PREPARATION
Parts Required For Assembly (not included): sewage pump basin minimum 18 in. w x 24 in. deep,
basin cover, basin gasket, 2 in. check valve, 2 in. union, gate valve or ball valve as required by codes, 2
in. Sched 40 PVC pipe, 2-step PVC glue system (primer and sealer), cable or zip ties
PACKAGE CONTENTS
GENERAL PUMP INFORMATION
A
1. Sewage pumps are pumps used to remove
waste water that contains solids up to 2 in.
in diameter. The most common application is
for draining bathroom waste water to a sewer
or septic line.
Three prong
grounded
outlet
equipped
with a
ground fault
interruptor
2 in. Discharge
pipe
Upper level drainage
Cleanout
Flange
Lavatory
45°
Elbow
2 in. Check
valve
2 in. gate valve
Union
Vent pipe
Sink
Main waste
line to sewer
or septic tank
Switch
Pump
1
A










