Operating Guide
6
DRAINING FOR SERVICING OR FOR WINTER
The system should be drained before it is disconnected for servicing, or if it is inoperative for an extended 
 
 
 
DIAPHRAGM TANK INSTALLATION
Diaphragm tanks are recommended for clear water applications. Vertical tanks are the most commonly 
Tank Specifications for tank capacity.
General Materials
 
 
 
REMINDER: All joints and connections must be airtight. A single pin-hole leak will prevent the proper operation of 
the system. Use thread compound on all threaded connections unless specified otherwise.
TYPICAL SUBMERSIBLE PUMP INSTALLATION
STEP 1
Complete pump assembly and electrical connections 
as specified in pump installation manual. Place tank 
in desired location and level it.
Thread tank tee into pressure tank so that the two 
3/8 in. holes in the tee face upward. Thread street 
tee into front of tank tee. See Figure 1.
3/8 in. PLUGS
TANK TEE
STREET TEE
STEP 3
Thread 3/4 in. male PVC adapter into the inlet side 
of tank tee. See Figure 2.
PVC ADAPTER
Thread pressure relief valve into top of street  
tee. Thread the 1/2 in. boiler drain into front of  
street tee. Cut and cement as many sections and 
couplings of PVC pipe needed to connect 3/4 in. male 
PVC adapter to pump discharge. See Figure 3.










