Operating Guide

16
Vent Plug
Pressure
Gauge or
Discharge
Tee Plug
5
Water Level
Check for leaks
Suction
pipe
4
Suction
pipe
3
4. Check to be sure water in the cavity of pump
(A) stays constant. If water level goes down,
it could indicate a leak in the foot valve,
check valve or suction pipe.
5. Once pump (A) is lled, wrap the pressure
gauge or discharge tee plug and vent plug
threads with thread tape and thread into
pump (A). Tighten with wrench.
NOTE: Before turning on breaker, open several
outlets or faucets to allow water ow during
priming.
A
A
3. Be sure entire suction pipe is filled when
priming. Depending on the length of suction
pipe, many gallons will be needed to fill the
entire system.
PUMP PRIMING AND STARTUP
A