Installation Guide
Nudo Products, Inc.
1500 Taylor Avenue 
Springfield, IL 62703 
Phone  1.800.826.4132 * 1.217.528.5636 
Fax 1.217.528.8722 
Form 6009.A Rev. 06 09/17 
!
Horizontal 
Installation 
Finish  Work 
Review  vertical  panel  installation  guidelines  above.  During  horizontal 
installation,  start  hanging  wall  panels  from  top  down to  floor.  Install  first 
panel, horizontally  at ceiling  with  the  groove flange  pointing  to  floor.  Insert 
small  clear  silicone  bead  to  insure  no  water  will  nest  in  groove  of  panel. 
Continue  the  method  working  in  one  direction to  the  floor  terminating in 
channel edge cap. 
Waste  materials shall be  disposed  of in  a  safe  manner  and  in  compliance 
with site, local, state and/or federal requirements. 





