Installation Guide

Nudo Products, Inc.
1500 Taylor Avenue
Springfield, IL 62703
Phone 1.800.826.4132 * 1.217.528.5636
Fax 1.217.528.8722
Form 6009.A Rev. 04 10/14
Info@nudo.com
www.nudo.com
Horizontal
Installation
Finish Work
Review vertical panel installation guidelines above. During horizontal
installation, start hanging wall panels from top down to floor. Install first
panel, horizontally at ceiling with the groove flange pointing to floor. Insert
small clear silicone bead to insure no water will nest in groove of panel.
Continue the method working in one direction to the floor terminating in
channel edge cap.
Waste materials shall be disposed of in a safe manner and in compliance
with site, local, state and/or federal requirements.