User Manual
Table Of Contents
- Preface
- Chapter 1 Introduction
- Chapter 2 Planning
- Chapter 3 Installing the system
- UL listed installations
- SIA system requirements
- Central station reporting
- UL Canada listed installations
- California state fire marshall listed installations
- Opening panel cover and chassis
- Mounting the panel
- Connecting hardwired devices
- Wiring a phone line to the panel
- Wiring the power transformer
- Installing X10 modules
- Chapter 4 Programming
- Programming overview
- Menu navigation
- System programming
- Resetting memory to the factory defaults
- Chapter 5 Testing
- Chapter 6 Troubleshooting and support
- Appendix A Specifications and tables
- Index
Simon XT
Installation Manual
30
Wiring the power transformer
Connect the power transformer to the panel AC terminals as shown in Figure 10.
Figure 10. Transformer connections
Note: Do not plug in the transformer at this time
Powering up the panel
When applying power to the panel connect the battery first, then plug in the AC power transformer. This
sequence prevents a battery fault condition.
Note: Maximum battery charge current is 60 mA. It may take up to 24 hours for a new battery to fully charge.
Installing the backup battery
To install the backup battery (6 VDC, 1.2 Ah), do the following:
1. Connect the lug end of the red battery lead to the red battery tab.
2. Connect the lug end of the black battery lead to the black battery tab.
3. Align the red (+) battery terminal with the right end of the terminal strip. The logo and specification
information should be readable.
4. Insert the front end of the battery under the forward battery compartment latch.
5. Push forward and rotate the battery downward until it seats beneath the rear battery compartment latch.
CAUTION: Do not connect the battery until you are ready to power up the panel. See Powering up the panel on page 30.
HW1 I/O
HW1&2
DC out
HW2 in
9 VAC in
9 VAC in
Battery +
Battery -