User's Manual

2
Figure 4. Installed TRAC-Lid
down) and insert each mounting screw all the way
through the mounting holes in the vault, with the
chain mounting bracket in the lower left hole.
7. Tighten all 4 screw heads in the order shown in
Figure1untiltheyareushwiththebackofthe
vault, and behind the vault lip.
8. Using the appropriate driver, drive all 4 screws into
the wall a little at a time until all 4 screws are driven
completely in and the vault is tight against the wall.
To install the TRAC-Vault BT through the wall:
1. Before drilling, ensure that no interference will
occurwithanyplumbing,electrical,reorsecurity
systems, etc.
2. Once the location for the unit has been decided,
level the template on the wall and punch or mark the
holes for drilling (see Figure 1).
3. Using the correct bit for the type of wall, drill
sufcientlylargeholestoaccommodatethe5/16”
all-thread rod.
4. Insert a lock washer and a nut on three of the four
all-thread rods. On the fourth, install a lock washer,
the chain mounting bracket, and then the nut. It is
importantthattheendofall-threadrodisushwith
the nut.
5. Put the Vault up to the wall (drain hole down)
and insert two all-thread rods through the top two
mounting holes. Insert the all-thread rod that you
have attached the chain mounting bracket to through
the lower left hole. Insert the last all-thread rod into
the bottom right hole. (See Figure 5.)
6. On the other side of the wall, mount the interior
cover plate (optional) onto the all-thread rods. Put
a5/16”fenderwasher,anda5/16”lockwasheron
Figure 3. Optional Tamper Switch
Figure 5. Side view, TRAC-Vault BT installed through the wall
Lock washer
Nut
TRAC-Vault
TRAC-Lid BT
Drain hole
Lid chain
attachment
Vault
chain bracket
Wall
Back plate
All-thread rod
Nut
Lock nut
Fender washer
Indicator
light
TRAC-Lid BT
TRAC-Vault
Thumb lever