Service manual
5 • Removal & Replacement
DM300c/DM400c/DM475 Service Manual (SV61801 Rev. D)
5-65
WOW Section of Feeder/WOW Module (use for DM475)
9. Remove load cell assembly.
10. Reassemble in reverse order. Keep in mind the following:
• When re-installing back wall on load cell base, attach wall to right
locking pin first, then left locking pin (when looking from the rear).
• Perform the feeder/WOW Registration Wall Alignment (section 5.56)
• Calibrate load cell and perform Static Weight test (see section 6.5)
8. Remove wall plate from two position pins on load cell wall (black circles
in photo above).
Wall Plate
Removed
Load Cell
Removed
5.55 WOW
Load Cell
Assembly