Pre-Delivery/Install Checklist
BOX MERCHANT PRE-DELIVERY GUIDE BOX MERCHANT PRE-DELIVERY GUIDE
7. Electrical Installation Of Spa After Delivery
(220/240 VOLT SPAS) IMPORTANT SAFETY NOTICE FOR ALL MODELS!
Proper grounding is extremely important.
For QCA Spas
Control Packs
VS 100
VS 300
VS 501
IN.YJ
1. To gain access to
the spa’s control box, remove the cabinet access panel on the front
of the spa, under the spas topside control. After removing the
access panel, remove the two control box cover screws and cover.
2. Select the power wire inlet through the spa cabinet you want to
use. (Either drill a hole through the cabinet or run wire in conduit
through the base of the spa.) Then feed the power cable through it
to the left side of the control box.
3. Run power wire through the circular hole on the left side of the
control box.
4. Connect wires, color to color, into the terminal openings and
tighten securely. Connect ground wire to the ground terminal and
tighten securely.
5. Secure the control box door by installing its screws, then re-install
the cabinet access panel under the topside control. Electrical
installation is now complete.
USE COPPER 240V
WIRE MIN. 6AWG. 40A 60HZ
S
Y
S
T
E
M
B
O
X
Neutral Hot Hot Ground
W
H
T
B
L
K
R
E
D
G
R
N
CIRCUIT BOARD
GROUND
WHITE (NEUTRAL)
BLK (HOT)
RED (HOT)
GREEN (GROUND)
TB1
17