Instructions

Ussc 9
CLEARANCES TO COMBUSTIBLES
It is of utmost importance that the clearances to combustible materials be strictly adhered to during
installation of the stove. Refer to the tables below :
Floor to ceiling height must be at least 7’ (2.13m) in all cases.
Do not place any combustible material within 4’ (1.2m) of the front of the unit.
The clearance between the ue pipe and a wall are valid only for vertical walls and for vertical ue
pipe.
The chimney connector must not pass through an attic or roof space, closet or similar concealed
space, a oor, or a ceiling.
For Canadian installations, where passage through a wall, or partition of combustible construction
is desired, the installation must conform to CAN/CSA-B365.
A ue pipe crossing a combustible wall must have a minimum clearance of 18” (457.2mm).
To reduce ue clearances from combustible materials, contact your local safety department.
Single Wall Pipe (Double Wall Pipe)
Model A B C D E F
2000 20(14)
(508mm(356mm))
22(20)
(559mm(508mm))
22.5(16.5)
(572mm(419mm))
32(30)
(813mm(762mm))
12(11)
(305mm(279mm))
22(21)
(559mm(533mm))
2500
12
(305mm)
20
(508mm)
16
(406mm)
30
(762mm)
10.5
(267mm)
20
(508mm)