Instructions / Assembly

7. Connect the base.
Secure the frame pieces together using the screws and nuts Part #I.
Make sure to tighten the screws.
6. Attach all the corners.
Attach the corners to the frame, make sure the
longer side of Part #C is on the longer side of the
trampoline as the picture shows.
5. Assemble frame parts B1 and B2 with the 4 legs.
Lay out the parts as shown in the figure. Connect the B1 and B2 and place it onto the leg bases as shown
in the figure below.
10
8. Then secure top rails to the leg base using Screws J and washers K
as shown in figure, and repeat this step to all legs.
C1
C1
A
A
C2
C2
A
A
B2
B1
B1
B2
E
E
E
E
N
N
Q
N
N
Q
E
D
E
E
E
P
O
O
P
O
P
D
D
O
D
O
P
D
P
O
P
B1
B2
B1
B2
1. The Part #A goes on the long side of the trampoline - the 17 ft side.
2. Make sure that all screw holes that connects the B rails to the legs are
facing the inside of the frame.
Note: