9 Finishing installation
SI0000175
5
3
1
1
2
4
6
Make a complete check up of the installation:
1. Check that the thermostats, and thermostatic heads (if installed),
are working correctly. Turn thermostat setpoints to maximum to
obtain a heating demand and make sure that the actuators are
running.
2. Set thermostats to the defined operating settings.
3. Close the covers of the room controller.
4.
Attach thermostats to the wall.
5. Print and fill in the “Installation report” (separate downloadable
document).
6. Give the printed manuals and all information about the system to
the user.