Install Instructions

Professional Plumbing Installation Guide
31
Section 5
Ground and Top-out Stage of Installation
After installing the service water line into
the building, the next area of focus is the
groundwork —under and in the soon-to-
be-poured concrete. The level of activity
during the groundwork stage varies
throughout the country. Areas doing
primarily slab-on-grade construction may
put the bulk of the tubing in the slab,
below the slab or run it overhead in the
attic. Traditional homes with basements
will run the majority of tubing within the
building framework.
Parts Inspection
To eliminate work delays, make sure all
required material is at the job site prior
to beginning a project. Use contractors
trained to evaluate component suitability
for installation. Check for material
defects, incomplete parts or shipping
damage. Check to see that the correct
amount and type of PEX tubing is on site
to start the project.