Testing the Base Unit Actuator
1. Press the button of the selected channel.
The LED lights up: the actuator is powered up
(time for actuator opening is roughly 5 minutes).
The LED does not light up.
Note: See Section 11: Troubleshooting for guidance.
2. Press the Test button twice to end the actuator test
(or wait 10 minutes).
Final Inspection
1. Verify that the antenna is correctly mounted.
Check if the thermostats are powered.
2. Close the cover of the base unit. Close the
thermostat covers where necessary.
3. Complete the installation report (Section 12).
4. Leave installation guide at jobsite for future reference.