Installation guide
Uponor Climate Co˘ntrol™ Zoning System Installation Guide
5
Section 3
Base Unit Installation
Base Unit Diagram
Preparation Before Installation
Review the wiring diagram located inside the base
unit cover.
Verify Contents
• Cordless electric drill
• 6mm (1¼") drill bit
• Small athead screwdriver
• Phillips screwdriver
Review Drawings
Review the drawings of the radiant oor heating system.
If the locations of the base units and thermostats are not
specied, determine the best positions.
• Install base unit with antenna close to each manifold.
• A 110VAC standard power receptacle is required for
the connection of the base unit.
• Protect the mounting locations for the Zoning System
from moisture.
• Use one thermostat for every zone with radiant
oor heating.
Terminal block for connection
of antenna and extensions
for additional I-75 interface
Interface RJ 9
connector for I-75
Push button and LED from
01 to 12 for channel registration
Test button with LED
Quick connectors for
the actuators
Socket for the connection
of the data stick
Power LED
110v/60Hz Compartment – Heat-demand Relay
110V
0201
110V
A3601012 C-55
IP30
T55
Made in France










