Install Instructions
5
4
www.uponorpro.com
Fast Trak⢠Installation Guide
5
3. Lay the Fast Trak 0.5 panels on the subfloor, ensuring a 2" (50mm)
gap between the panel and the wall (Edge Strip).
4. Remove the adhesive backing to secure the panels to the floor. Ensure
the panel is covering the PE foil section of the Edge Strip, creating a
seal so no leveling compound can get behind the Edge Strip.
Installing foil element
2
1
When laying the panel,
allow a 2" (50mm) gap
between the panel and
the wall (Edge Strip).
Important! When installing the
panels, be sure boots are clean from
dirt and debris which can hinder
tubing placement in the panels.
Figure 6: Install Panels