Install Instructions
16
www.uponorpro.com
16
Section 8
Pressure Testing
To ensure the system is installed correctly and operating properly, pressure
test the system.
1. Connect pressure testing equipment to the manifold and
pressurize a maximum of 87 psi for two hours.
2. When the two hours have elapsed, check that the pressure
rating is the same.
Note: Make sure all valves are open
After 2
hours
,
Max 87 psi
check for leakage.
open
2 hours max. 87 psi
2
1