Manual
ROTORBAKE Series Ovens - electric version - Page 18
A
SSEMBLY
O
VEN DIVIDED INTO TWO PARTS
Remove all the material stowed inside the oven and make sure all the parts are in good
conditions.
Position the two parts“1 - 2” in vertical and lay a bead of high temperature sealing
compound “3” around the perimeter surface of both parts.
Position part “1” “2” together and all nuts and bolts and tighten.
Insert the first lateral side panel “7” and move it in the low position (make sure both central
locating bolts on top are aligned).
Fill the wall space in the oven structure with the insulating material contained in the bags
“6” starting from the bottom upwards, taking care to press it, to make it uniformly compact.
Repeat it and install the last panel “7” at the top.
Repeat it in the other side of the oven.
Screw the temperature probe “T” in its place and mount the high temperature probe “S”
under the insulating making sure it rests on top of the oven chamber.
Place the electric panel “9” outside on the oven, screw down and secure in position.
Mount electrical connection protection covers “10 – 11”.
Mount and screw the hood “12” at the front of the oven.
Place the door ramp in location slots “13” at base of front of oven.
T= Temperature Probe
S= High Temperature Probe