Technical data

Operation
4-37
P/N 7135049A
E 2007 Nordson Corporation
VBC_Siemens
Setup (Screen 2: e.g. Units, Ready Delay Time,
Service Interval, Field Bus)
NOTE: To be able to work on the parameter level, the password for level 2
(trained personnel) must first be entered.
Fig. 4-42 V14
Select Temperature/Pressure Units
Either °C or °F can be selected as the temperature unit.
°C
Fig. 4-43 V15
Either bar or psi can be selected as the pressure unit.
bar
System Ready Setup
The system ready delay time is the time after which all components have
reached their setpoint temperatures and before the system indicates
readiness. This additional time allows the material to reach a thermally
homogenous state.
The system ready delay time, if activated, runs after every heatup phase
(status display).
Fig. 4-44 V17
0 min
Service Interval Setup
When the Service interval time defined by the customer has expired, the
service symbol (open-jawed wrench) lights up on the starting screen. The
symbol can be used e.g. to signal that the filter needs to be changed.
Reset
The time for the service interval is reset, and the service symbol
is switched off.
Fig. 4-45 V16
500 h (total hours with heaters on)