Technical data

Operation
4-5
P/N 7135049A
E 2007 Nordson Corporation
VBC_Siemens
Initial Startup
After the melter has been properly installed, initial startup can take place.
The melter was subjected to extensive testing prior to shipment. In doing so,
the tank was filled with a special test material. Material residue may still be
present in the melter. To remove the residue, melt and feed several
kilograms of material before starting production.
CAUTION: Do not operate Nordson gear pumps without material. Before
switching on the motor, ensure that the tank is filled.
1. Set the main switch to I/ON.
Position I/ON = Melter switched on.
Position 0/OFF = Melter switched off.
Padlocks can be used to protect the main switch from being turned on by
unauthorized personnel.
2. Wait until the starting screen appears on the control panel.
NOTE: Do not touch or cover the screen during startup. Wait until it has
completed the function test and the light tower lamp test and the starting
screen appears.
Fig. 4-3 Starting screen