Technical data
Installation
3-2
P/N 7135049A
E 2007 Nordson Corporation
VBC_Siemens
Lifting (Unpacked Melter)
Refer to the section Technical Data for weight. Lift only
S With suitable lifting equipment on the melter chassis
S With a forklift. There are tracks for the forklift under the melter chassis.
Installation Requirements
Set up only in an environment that corresponds to the stated Degree of
Protection (Refer to section Technical Data). Do not mount in a potentially
explosive atmosphere! Protect from vibration.
CAUTION: Protect the control panel from direct sunlight. The UV rays
reduce the service life of the liquid crystals.
Exhausting Material Vapors
Ensure that material vapors do not exceed the prescribed limits. Always
observe the safety data sheet (MSDS) for the material to be processed. If
necessary, exhaust material vapors and provide sufficient ventilation of the
location of the system.
Fig. 3-2