User manual

PAT700 Total Organic Carbon Analyzer – Diagnostics Page 131
Anatel Operator Manual
Figure 8-10 Load bottles dialog box, plumbing test
Bottle positions graphics show you the order in which to install the bottles.
Unlock icon energizes the bottle bay door lock for five seconds, allowing you to
open the door.
Run test icon runs the plumbing test.
Cancel icon returns you to the previous dialog box. All changes made in any of the
dialog boxes are lost.
3) After you’ve entered the correct bottle information, touch the run test icon, which
returns you to the plumbing test dialog box. See Figure 8-8, page 129.
4) Select the desired test from the flow test selection drop down list box.
5) When the test is completed, touch the unload bottles icon. The unload/replace
bottles dialog box appears. See Figure 8-11.
Figure 8-11 Unload/replace bottles dialog box
Unlock icon energizes the bottle bay door lock for five seconds, allowing you to
open the door.
Done icon returns you to the plumbing test dialog box.