User guide
5
Installation Documentation
Note: The following table of contents for installation methods references
all the methods modules. However, due to space, only the methods
for “Module 24 Equipment Loading and Diagnostics” and “Module
28 Routine System Level Testing” are provided.
MODULE 01 PREFACE MODULE
MODULE 02 PLANNING MODULE
MODULE 03 DMS PHYSICAL HANDBOOK
MODULE 04 GENERAL INFORMATION
MODULE 06 FLOOR PREPARATION
MODULE 08 EQUIPMENT HANDLING AND SECURING
MODULE 10 HARDWARE FABRICATION
MODULE 12 PRIMARY ASSEMBLY
MODULE 14 AC OPERATIONS
MODULE 16 POWER AND GROUNDING CABLING
MODULE 18 SYSTEM CABLING
MODULE 20 SUPPLEMENTAL ASSEMBLY
MODULE 22 PREPARATION AND POWER UP
MODULE 23 ENET UPGRADE
MODULE 24 EQUIPMENT LOADING AND DIAGNOSTICS:
Meth #
Title
0180 OPM Power Verification
0185 Communication Module Installation & Functional Test
0188 Star Remote Mod Outdoor/Indoor Cabinet (NTTR40/45)
0192 SDM Installation/Commissioning for SDI
0207 CPU Micro-code Tests and System Loading
0214 Memory Commissioning Firmware Test
0235 JNET Integrity Test
0238 NNE Software Configuration
0239 BWA - NIU Software Configuration 1.2
0284 BWA Reunion Acceptance Test Plan
0306 Gateway Card (NT7X07) Installation and Configuration
0310 CORE MAINTENANCE TEST
0317 Star Remote Module Commissioning Manual
0345 Host Peripheral Module Diagnostic Tests
0350 Trunk Diagnostics Tests (Carrier/TTP)
0395 IW-SPM/IW-SPM IP Commissioning Guide
0396 GBMD13 Installation
0397 GEM13 Call Intercept Provisioning Center
0398 Simplex SS7/IP Gateway Install & Commissioning Method
0399 SS7/IP Gateway Installation & Commissioning Method
0419 NGS WPP Release 04 Base Software Installation
0469 MicroNode Switch
0753 Audio Provisioning Server Verification & Configuration
0770 Base Commissioning for Passport 6K, 7K, and 8K
0831 DDU Installation Testing and Retrofit Procedure
0854 Installation and Commissioning of NTLX04AA HIOP Card
0875 Commissioning of 9 Track Magnetic Tape Drives
1443 Star Remote Hub Equipment (SRHE) Frame
1497 SRHE Commissioning for DMS-100
1865 Commissioning of EMPC Card for Turbolink
1901 Installing and Commissioning of NT1X89 Card for SMDI
1903 Comm. of EMPC CP for Rem Poll’n & Patch Downloading
4186 System Diagnostics Certification
5004 Log Monitoring
5043 LIS Loading and Diagnostic Tests for SSLPP and SNSE
5059 Digital Line Module (DLM) Testing
5138 SuperNode Data Manager (SDM-FT) Instal/Commissioning
5158 LPP/LIM Loading and Diagnostic Tests
5159 ASU Commissioning on the LPP/SSLPP and the
5176 ISDN Line Card Diagnostic Tests
5180 Addition and Testing of Stratum 2 Clock - DMS SuperNode
5200 PRI Commissioning Process
5218 Application of Patches to XPMs
5222 PMTESTER Users Guide
5225 Core Tester
5228 SuperNode Data Manager (SDM-FT) for SDMX0011 NCL
5229 SDM-SX Installation/Commissioning
5230 ISDN Integrated Line Testing
5235 Automated Span Test
5236 SDM-FT Installation for SDMX0012 to SDMX0014
5257 Miscellaneous Hardware Tests
5281 Shell-TG and DFIL Users Guide
5340 Line Continuity Testset (LCT) Procedure
5515 EDSPM Loading and Commissioning
5550 Remote Switching Center - Multi Access Testing
Continues on the next page.