User's Manual

UL-801 Installation Manual
Page 107
23-20-06 15 December 2011
A. Airworthiness Limitations
Scheduled Maintenance Program
Scheduled Maintenance Program tasks to be added to the aircraft operator’s appropriate
aircraft maintenance program are as follows:
(1) Recommended Periodic Scheduled Servicing Tasks: None Required
(2) Recommended Periodic Scheduled Preventative Maintenance Tests/Checks to
determine System Condition and/or Latent Failures: None Required
(3) Recommended Periodic Inspections: None Required
(4) Recommended Periodic Structural Inspections: None Required
(5) Recommended Replacement Interval: None Required
Unscheduled Maintenance Program
Unscheduled maintenance may include upgrade of the program software contained in the
UniLink, upgrade of the Field Loadable software, or other modifications. If the UniLink is
removed and the software changed, the configuration settings should be checked and
amended as necessary in accordance with the instructions contained in applicable manuals.
B. Compliance
Universal Avionics has published two compliance reports for the UL-80X systems. These
reports describe installation requirements that must be considered as part of the installation
airworthiness approval. Contact Universal Avionics Product Support to receive the latest
revisions of these reports.
RPRT-2012-1005, AC 20-140A Compliance Report for the UL-80X UniLink LRU with
Software SCN 30.X
RPRT-2012-1007, UniLink UL-80X With Software SCN 30.X Compliance Summary Report