User's Manual
UniLink UL-800/801 FANS
SCN 30.X
Operator’s Manual
56 23-20-06.02
December 2011
Direct-To
To make a Direct-To route request:
1. On the ATC REQ RTE 1/2 page, press DTO, LSK [2L]. The ATC
REQUEST DTO page will display.
2. Press the appropriate LSK to enter information for FIX, NAVAID,
AIRPORT, LAT/LON, or Place/Bearing/Distance (P/B/D). The
display will return to the ATC REQ RTE 1/2 page showing the
entered information at the DTO option.
3. If applicable, press DUE TO, LSK [1R] and toggle between
NONE, WEATHER, and A/C PERF as applicable.
4. Press REVIEW, LSK [4L]. The ATC REVIEW 1/X page will
display showing information from the ATC REQ RTE 1/2 page.
NOTE: If no data was entered in the DTO field, the pop-up window
DATA REQUIRED will display.
5. Press FREE-TEXT, LSK [3R] to add any additional text for the
Direct-To request.
6. Press SEND, LSK [4R] to put the request into queue for
transmission
Heading or Ground Track
To make a heading or ground track route request:
1. On the ATC REQ RTE 1/2 page, press HEADING, LSK [2R], or
TRACK, LSK [3R], as needed.
2. Enter the desired heading or ground track.
NOTE: Entry of a number will result in a magnetic heading. Entry of a
number followed by a “T” will result in a true heading.