Installation manual

UT340, UT360, UT380, and UT3100
Planning and Installation Manual
2
CABLE ENTRY
CONDUIT
CONNECTION
BOX
101 UPS Footprint
Figure 1: Footprint of the UT340, UT360, UT380, UT3100
with Conduit Connection Kit (Top View)
Inches Millimeters
Allow a minimum of 3 feet (914 mm) at the front of the
unit, 3 feet (914 mm) at the top of the unit, and 6 inches
(152 mm) at the back of the unit for service clearance
and for air flow.
Cable entry from bottom only.
The conduit connection kit includes a conduit connection
box and three pedestals, shipped separately. See
installation instructions shipped with kit.
A
39.4 1000
B
17.9 455
C
19.8 504
D
27.9 708
E
31.7 804
F
2.4 60