INSTALLATION INSTRUCTIONS M1913
CONTENTS One (1) AXON™ Control Module One (1) Rail Clamp A (Round Holes) One (1) Rail Clamp B (Hex Holes) Two (2) Cross Bolts Two (2) Hex Nuts One (1) AXON™ Screw Plug
WARNING: CAUTION: ENSURE FIREARM IS UNLOADED OVER-TORQUING FASTENERS CAN DAMAGE YOUR MOUNT AND WILL NOT BE COVERED BY WARRANTY. NOTE If using mini zip ties (sold separately) for cable management, install them prior to placing assembly on rail. Secure zip ties in loose loop for now. 1 2 Place the AXON™ Control Module on M1913 Rail in desired location. Align the Rail Clamps along the side of the AXON™ Control Module ensuring the logo on each Rail Clamp is upright.
3 4 Fully seat the Hex Nuts in the recesses in Rail Clamp B. Thread the Cross Bolts in the circular holes in Rail Clamp A via the pass-through and into the Hex Nuts in Rail Clamp B. Finger tight both before applying torque to either. Torque to 5 in-lbs (0.57 Nm). 5 Route cables from AXON™ to devices and fully seat plugs in sockets. Avoid sharp bends and routing over extreme heat areas and sharp edges.