User Manual
PORTAL TI
Site Planning and Base Installation for Portal TI Units 7
Document #: PTL1008
2 Mechanical Installation
2.1 Hardware Required
Prior to beginning the installation, take the time to verify that all the following required
parts are present and accounted for.
Items supplied with the Portal:
• Allen Wrench For Door
• Key set for door
• Key set for vault door
• IEC-320-C14 Female AC Power Connector
Items supplied with the Base:
• (3) ½: Hex Nuts
• (3) ½” Flat Washer s
• (3) ½” Lock Washers
Items supplied with the Brick-in Option:
• Adapter Plate
• (4) J-Bolts and nuts (f or securing the adapter plate)
• (3) ½:” x 1” Hex Bolts
• (3) ½” Flat Washer s
• (3) ½” Lock Washers
2.2 Recommended Tools
2.2.1 Mechanical Installation Tools
The following tools are recommended for the typical mechanical installation of this
Portal TI unit and base:
• ¾” deep well socket and socket wrench
• Open end 9/16” wrench
• Small, thin blade, flat- tip screwdriver
• Hammer
• Dual-plane Level
• 50’ foot tape measure
The following items are required only when installing the Portal TI into an existing
concrete slab:
• Hammer drill
• 2.5” Concrete hammer drill bit