Service manual

272359-UUM-A-0407
6 Unitary Products Group
SEQUENCE OF OPERATION
The following describes the sequence of operation of the furnace. Refer
to Figure 1 for component location.
1. Call for 1st stage only
On a call for 1st stage heat, the thermostat closes a circuit
between R and W1.
The Microprocessor in the Furnace Control runs a ‘Self Check’.
The Control checks the Primary Limit, Auxiliary Limit, and Roll-
out Switches for closed contacts.
The Control checks that the Low Fire Pressure Switch (1LP) is
open.
The Inducer Motor is energized on high speed, closing the con-
tacts of 1LP.
The Control checks that 1LP is closed.
The Igniter is energized for 17 seconds.
The Gas Valve is energized on 1st Stage (Low Fire).
Flame Rectification is recognized within 7 seconds.
The Inducer is switched to low speed.
30 seconds after flame is proven, the ‘Heat Low’ relay is ener-
gized providing 120 Volts AC to the Blower Motor.
At the same time, the EAC and Hum relays are energized, pro-
viding 120 Volts AC to the EAC Hot and Hum terminals.
2. Call for 2nd Stage after 1st Stage is operating
A call for 2nd Stage can be made by a 2-Stage thermostat, or by
the W2 delay timer on the furnace control.
The Inducer Motor is shifted to high speed by the control, closing
the contacts of 2LP (The High Fire Pressure Switch.).
The Control checks that 2LP is closed.
The Gas Valve is energized on 2nd Stage (High Fire).
The Control simultaneously de-energizes the Heat Low relay
and energizes the Heat High relay, providing 120 Volts AC to a
different speed of the Blower Motor.
3. 2nd Stage is satisfied, 1st Stage still calling.
If a Single Stage Thermostat is used, the Furnace will stay on
High Fire until the thermostat is satisfied.
When the circuit between R and W2 is opened, the Control
switches the Inducer Motor to low speed, causing the contacts of
2LP to open.
When 2LP opens, 2nd Stage of the Gas Valve is de-energized.
30 seconds later, the Control switches the Blower from Heat
High to Heat Low.
4. 1st Stage Satisfied
The Thermostat opens the circuit between R and W1
Immediately the Gas Valve is de-energized and Flame Rectifica-
tion is lost.
The Inducer Motor is de-energized after a 15 second Post Purge
and the Hum terminal is de-energized.
The ‘Fan Off Delay’ circuit is initiated. The Delay time can be
field set at 60, 90, 120, or 180 seconds. It comes from the fac-
tory set at 60 seconds.
The Heat Low terminal is de-energized; stopping the Blower and
the EAC terminal is de-energized.
5. 1st and 2nd Stage called simultaneously
The 1st stage call is processed as described in paragraph 1
above.
Once Flame Rectification is established, 2nd Stage is entered
immediately as described in paragraph 2 above.
6. 1st and 2nd Stage satisfied simultaneously
Both stages of the Gas Valve are de-energized.
Flame Rectification is lost.
The Inducer and Hum relays are de-energized after a 15-second
post purge.
30 seconds later the Control shifts the Blower from Heat High to
Heat Low.
After the Blower-Off Delay Circuit is satisfied, the Blower and
EAC are de-energized.
7. Manual Fan Operation
With the thermostat in the Fan On position, a circuit is completed
between R and G of the Control.
The Heat Low and EAC relays are energized by the Control.
8. Call for Cooling
The thermostat closes two circuits R to Y and R to G. Since the
Outdoor Unit is connected to Y and C at the Control, it is ener-
gized.
The Cool and EAC relays are energized by the Control.
A Blower-Off Delay Timing Circuit is energized by the call on Y.
9. Cooling call satisfied
The thermostat opens the R to Y and R to G circuits.
The Outdoor Unit is de-energized.
The 60-second, Blower-Off Delay, timing circuit is initiated.
After 60 seconds, the Cool and EAC relays are de-energized.
Heating Indoor Fan Off Delay
Changing the blower delay jumper on the Integrated Control can
change the indoor fan “OFF” time delay. Refer to Figure 6 for the jumper
settings to obtain the desired fan OFF delay. The blower off delay must
be long enough to adequately cool the furnace, but not so long that cold
air is blown into the living space.
The blower on delay is fixed at 30 seconds and cannot be adjusted.