SM SOLAR MOUNT TABLE OF CONTENTS A - PRO SERIES SYSTEM COMPONENTS B - SYSTEM LAYOUT C - CODE COMPLIANCE NOTES D - ROOF ATTACHMENT & L-FEET E - SPLICE & THERMAL BREAK F - ATTACH RAIL TO L-FEET G - MICROINVERTER MOUNTING H - MICROINVERTER SYSTEM GROUNDING I - ELECTRICAL GROUNDING W/ ENPHASE MICRINVERTER FOR SPLICE & THERMAL BREAK J - STANDARD SYSTEM GROUNDING K - END CLAMP, FIRST MODULE L- BONDING MID CLAMP M - REMAINING MODULES N - BONDING CONNECTION GROUND PATHS INSTALLATION GUIDE O - BONDING CONNECTION
SM PRO SERIES SYSTEM COMPONENTS SOLAR MOUNT INSTALLATION GUIDE PAGE RAIL: Supports PV modules. Use at least two per A SM STANDARD RAIL SM LIGHT RAIL Wrenches and Torque Anti-Seize Wrench or Socket Size Recommended Torque (ft-lbs) Mid Clamp 1/2” 11 MLPE Mount 1/2” 10 End Clamp 1/2” 3 L-Foot to Rail 1/2” 30 Rail Splice 1/2” 10 Stainless steel hardware can seize up, a process called galling. To significantly reduce its likelihood: 1.
SM SYSTEM LAYOUT SOLAR MOUNT INSTALLATION GUIDE PAGE PLANNING YOUR SOLARMOUNT INSTALLATIONS The installation can be laid out with rails parallel to the rafters or perpendicular to the rafters. Note that SOLARMOUNT rails make excellent straight edges for doing layouts. Center the installation area over the structural members as much as possible. Leave enough room to safely move around the array during installation.
SM SOLAR MOUNT CODE COMPLIANCE NOTES C INSTALLATION GUIDE PAGE SYSTEM LEVEL FIRE CLASSIFICATION The system fire class rating requires installation in the manner specified in the SOLARMOUNT Installation Guide. SOLARMOUNT has been classified to the system level fire portion of UL 1703. This UL 1703 classification has been incorporated into our UL 2703 product certification. SOLARMOUNT has achieved system level performance for steep sloped roofs.
SM SOLAR MOUNT ROOF ATTACHMENT & L-FEET D INSTALLATION GUIDE PAGE ROOF PREPARATION: Layout and install flashing at rafter locations determined per Design and Engineering Guide. DRILL PILOT HOLES: Center the roof attachment over the rafter and drill a pilot hole(s) for the lag bolt(s). NOTE: Determine lag bolt size and embedment depth. FLASHING INSTALLATION: Insert the flashing so the top part is under the next row of shingles and the hole lines up with the pilot hole.
” /16 o3 0t E INSTALLATION GUIDE PAGE SM SPLICE & THERMAL BREAK SOLAR MOUNT p ga b n ee etw ls rai SPLICE INSTALLATION (IF REQUIRED PER SYSTEM DESIGN) If your installation uses SOLARMOUNT splice bars, attach the rails together before mounting to the L-feet / footings. Use splice bars only with flush installations or those that use low-profile tilt legs. A rail can be supported by more than one footing on both sides of the splice.
SM ATTACH RAIL TO L-FEET SOLAR MOUNT INSTALLATION GUIDE PAGE 3/8” T-bolt PLACE T-BOLT INTO RAIL & SECURE BOLT: Insert 3/8” T-bolt into rail at L-foot locations. Apply Anti-Seize to bolt. Rotate T-bolt into position. SECURE T-BOLT: Apply Anti-Seize to bolt. Rotate T-bolt into position. ALIGN POSITION INDICATOR: Hand tighten nut until rail alignment is complete. Verify that position indicator on bolt is vertical (perpendicular to rail) TORQUE VALUE (See Note on PG.
SM MICROINVERTER MOUNTING SOLAR MOUNT INSTALLATION GUIDE PAGE INSTALL MICROINVERTER MOUNT T-BOLT: Apply Anti-Seize and install pre-assembled ¼” dia. bonding T-bolts into top ¼” rail slot at microinverter locations. Rotate bolts into position. G INSTALL MICROINVERTER: Install microinverter on to rail. Engage with bolt. INSTALL MICROINVERTER: TORQUE VALUE (See Note on PG.
SM SOLAR MOUNT MICROINVERTER SYSTEM GROUNDING H INSTALLATION GUIDE PAGE SM EQUIPMENT GROUNDING THROUGH ENPHASE MICROINVERTERS The Enphase M215 and M250 microinverters have integrated grounding capabilities built in. In this case, the DC circuit is isolated from the AC circuit, and the AC equipment grounding conductor (EGC) is built into the Enphase Engage integrated grounding (IG) cabling.
SM ELECTRICAL GROUNDING W/ SOLAR ENPHASE I MICROINVERTER FOR SPLICE & THERMAL BREAK INSTALLATION GUIDE PAGE MOUNT CONTINUOUS RAIL & ELECTRICAL BONDING SPLICE EXPANSION JOINT W/GROUNDING LUGS & COPPER JUMPER EXPANSION JOINT W/O ELECTRICAL BONDING CONNECTION Enphase Microinverter (MI) Requirements (Model No. M215 & M250) Enphase Microinverter (MI) Requirements (Model No. M215 & M250) Enphase Microinverter (MI) Requirements (Model No.
WEEBLUG Single Use Only ONLY ONE LUG PER ROW OF MODULES: Only one lug per row of modules is required. See Page E for additional lugs required for expansion joints. GROUNDING LUG - BOLT SIZE & DRILL SIZE BOLT SIZE DRILL SIZE WEEBLug 1/4" N/A - Place in Top SM Rail Slot IlSCO Lug #10-32 7/32" • • Torque value depends on conductor size. See product data sheet for torque value.
SM ENDCLAMP, FIRST MODULE SOLAR MOUNT INSTALLATION GUIDE PAGE INSTALL MODULE END CLAMPS: The End clamp is supplied as an assembly with a 1/2" hex head bolt that is accessible at the ends of rails. The clamp should be installed on the rails prior to installing end modules. INSTALL END CLAMPS ON RAIL: Slide end clamp on to rail by engaging the two t-guide brackets with the top slot of the rails. Ensure bolt is extended as far as possible so that clamp is positioned at max. distance from end of rail.
INSTALL MIDCLAMPS: Midclamp is supplied as an assembly with a T-bolt for module installation. Clamp assemblies may be positioned in rail near point of use prior to module placement. INSERT MIDCLAMP ASSEMBLY: Insert 1/4" T-Bolt into top slot of rail PLACE ADJACENT MODULE AGAINST CLAMPS: Modules must be tight against clamps with no gaps. Tighten nut to required torque. POSITION INDICATOR - SERRATED T-BOLT: Verify the T-bolt position indicator is perpendicular to the rail.
SM REMAINING MODULES SOLAR MOUNT INSTALLATION GUIDE PAGE INSTALL REMAINING MID-CLAMPS: Proceed with module installation. Engage each module with previously positioned Midclamp assemblies. M POSITION T-BOLT ALIGNMENT MARKS: Verify that the position indicator(s) & T-bolt shaft(s) are angled in the correct position. Tighten to final torque. TORQUE VALUE (See table and notes on PG. A) 11 ft-lbs. No anti-seize.
DU LE FR AM LE FR AM 1 E BO ING 3 3 LT BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY 1 Aluminum mid clamp with stainless steel bonding pins that pierce module frame anodization to bond module to module through clamp 2 Stainless steel nut bonds aluminum clamp to stainless steel T-bolt 3 Serrated T-bolt head penetrates rail anodization to bond T-bolt, nut, clamp, and modules to SM rail Option 1: Ground Through Enphase Trunk Cable 2 B WA RD Aluminum splice bar spans across rail gap
SM SOLAR MOUNT TEMPORARY BONDING CONNECTION BONDING CONNECTION GROUND PATHS INSTALLATION GUIDE PAGE REQUIRED ONLY FOR TEMPORARY BONDING DURNING ARRAY MAINTENANCE co MODULE REMOVED O Ils 4 B- SG BONDING MID CLAMPS MAINTAIN GROUND PATH co Ils SO L ID P CO P ER W IR 4 B- SG E TEMPORARY BONDING CONNECTION DURING ARRAY MAINTENANCE When removing modules for replacement or system maintenance, any module left in place that is secured with a bonding Midclamp will be properly grounded.
SM SOLAR MOUNT TRIM AND END CAP INSTALLATION P INSTALLATION GUIDE PAGE Break line and discard top piece for SM Light Rail TRIM MIDCLAMPS: Ensure Trim lip is in contact with module face and verify alignment marks on T-bolts are in proper position, tighten midclamp on Trim, repeat at each gap between modules. TORQUE VALUE (See table and notes on PG. A) 11 ft-lbs. No anti-seize. FINISH TRIM INSTALLATION.
SM STANDARD SERIES SYSTEM COMP. SOLAR MOUNT Q INSTALLATION GUIDE PAGE RAIL: Supports PV modules. Use at least two per Wrenches and Torque Anti-Seize* Wrench Size Recommended Torque (ft-lbs) 1/4” Hardware 7/16” *10 3/8” Hardware 9/16” *30 #12 Hardware 5/16” 10 Torques are not designed for use with wood connectors *w/Anti-Seize. Stainless steel hardware can seize up, a process called galling. To significantly reduce its likelihood: 1.
SM B SIZE ENDCLAMP MODULE COMPATIBILITY SOLAR MOUNT C SIZE INSTALLATION GUIDE PAGE D SIZE K SIZE ENDCLAMP E SIZE F SIZE ENDCLAMP ENDCLAMP ENDCLAMP ENDCLAMP Module Thickness 33mm to 36mm 1.30in to 1.42in Module Thickness 30mm to 32mm 1.18in to 1.26in Module Thickness 38mm to 40mm 1.50in to 1.57in Module Thickness 39mm to 41mm 1.54in to 1.61in Module Thickness 50mm to 51mm 1.97in to 2.00in Module Thickness 45mm to 47mm 1.77in to 1.
SM ATTACH RAIL TO L-FEET SOLAR MOUNT INSTALLATION GUIDE PAGE 3/8” T-bolt PLACE T-BOLT INTO RAIL & SECURE BOLT: Insert 3/8” T-bolt into rail at L-foot locations. Apply Anti-Seize to bolt. Rotate T-bolt into position. SECURE T-BOLT: Apply Anti-Seize to bolt. Rotate T-bolt into position. ALIGN POSITION INDICATOR: Hand tighten nut until rail alignment is complete. Verify that position indicator on bolt is vertical (perpendicular to rail) TORQUE VALUE (See Note on PG.
SM ENDCLAMP & FIRST MODULE SOLAR MOUNT T INSTALLATION GUIDE PAGE INSTALL MODULE ENDCLAMPS: The Endclamp is supplied as an assembly with a T-bolt, serrated flange nut, and washer. The washer retains the clamp at the top of the assembly. This will enable the clamp to remain upright for module installation. 1/2" MIN. INSERT ENDCLAMP T-BOLT: Insert 1/4” T-bolt into rail. ROTATE ENDCLAMP T-BOLT: Rotate T-bolt into position.
INSTALL MIDCLAMPS: Midclamp is supplied as an assembly with a T-bolt for module installation. Clamp assemblies may be positioned in rail near point of use prior to module placement. INSERT MIDCLAMP T-BOLT: Apply Anti-Seize and insert 1/4” T-bolt into rail. TRIM INSTALLATION INSTRUCTIONS POSITION INDICATOR - SERRATED T-BOLT: Verify the T-bolt position indicator is perpendicular to the rail.
SM REMAINING MODULES & TRIM SOLAR MOUNT INSTALLATION GUIDE PAGE POSITION T-BOLT ALIGNMENT MARKS: Verify that the position indicator(s) & T-bolt shaft(s) are angled in the correct position. NOTE: Apply Anti-Seize to each Mid Clamp prior to installation. TORQUE VALUE (See Note on PG. Q) 1/4” nuts to 10 ft-lbs. w/Anti Seize INSTALL REMAINING MID-CLAMPS: Proceed with module installation. Engage each module with previously positioned Midclamp assemblies. 1/2" MIN.
W INSTALLATION GUIDE PAGE SM TRIM RETROFIT INSTALLATION SOLAR MOUNT 1ST MIDCLAMP: Position Trim in front of array. Insert Midclamp into the Trim slot, aligned with the gap between the 1st two modules at either end of array. MOUNT TRIM: Position Trim beneath modules by sliding T-bolt into gap between modules and tighten. Midclamp should stay in position and support Trim. Tighten snugly enough so that Trim is held firmly in place.
LE ME BO T-B O 3 BONDING MIDCLAMP ASSEMBLY 2 Serrated flange nut bonds stainless steel clamp to stainless steel T-bolt 3 Serrated T-bolt head penetrates rail anodization to bond T-bolt, nut, clamp, and modules to grounded SM rail. 2 T-B O 1 LT Serrated T-bolt head penetrates rail anodization to bond T-bolt, nut, and Endclamp to grounded SM rail 2 2 SP L-F O E AR DW OT AR GH IN ND Aluminum splice bar spans across rail gap to create rail to rail bond.
SM SOLAR MOUNT TEMPORARY BONDING CONNECTION BONDING CONNECTION GROUND PATHS Y INSTALLATION GUIDE PAGE REQUIRED ONLY FOR TEMPORARY BONDING DURING ARRAY MAINTENANCE 4 B- G oS lsc I MODULE REMOVED -4 GB oS lsc I BONDING MID CLAMPS MAINTAIN GROUND PATH IRE W ER P LID SO P CO TEMPORARY BONDING CONNECTION DURING ARRAY MAINTENANCE When removing modules for replacement or system maintenance, any module left in place that is secured with a bonding Midclamp will be properly grounded.
SM APPENDIX A SOLAR MOUNT A System Certification PAGE The SOLARMOUNT system has been certified and listed to the UL 2703 standard (Rack Mounting Systems and Clamping Devices for Flat-Plate Photovoltaic Modules and Panels). This standard included electrical grounding, electrical bonding, mechanical load and fire resistance testing. In conducting these tests, specific modules are selected for their physical properties so that the certifications can be broadly applied.
SM APPENDIX A SOLAR MOUNT B System Certification PAGE Electrical Bonding and Grounding Test Modules The list below is not exhaustive of compliant modules but shows those that have been evaluated and found to be electrically compatible with the SOLARMOUNT system.
SM APPENDIX A SOLAR MOUNT System Certification PAGE Electrical Bonding and Grounding Test Modules The list below is not exhaustive of compliant modules but shows those that have been evaluated and found to be electrically compatible with the SOLARMOUNT system.
FLASH FLASHKIT KIT PRO PRO SM INSTALLATION GUIDE INSTALLATION GUIDE SOLAR MOUNT APPENDIX B F L A S H K I T P R O I S T H E C O M P L E T E F L A S H I N G A N D AT TA C H M E N T S O L U T I O N F O R C O M P O S I T I O N R O O F S . F L A S H K I T P R O I S T H E C O M P L E T E F L A S H I N G A N D AT TA C H M E N T S O L U T I O N F O R C O M P O S I T I O N R O O F S .