Install Manual

Table Of Contents
SOLARHOOKS
PAGE
3
PRO SERIES INSTALLATION GUIDE
UNIVERSAL
NOTE: SOLARHOOK UNIVERSAL is
compatible with all tile profiles.
Installation process is the same for
all profiles.
Position hook, adjusting arm-base
bolt position as needed. Use 3/16
bit to drill 2 pilot holes.
Torque arm-base nut to 16 ft. lbs.
Remove hook, clean debris and
fill pilot holes with roofing
sealant
Reposition hook, secure with
included lag screws.
Replace tiles, if necessary notch
with grinder to ensure proper fit.
1. 2.
3. 4.
5. 6.
Install components as shown above.
Locate and mark rafters.Remove tiles around installation
area.