User's Manual
Table Of Contents
- 1.0 INTRODUCTION
- 2.0 FEATURES & OPTIONS
- 3.0 SAFETY WARNINGS
- 4.0 WARRANTY (summary)
- 5.0 UNPACKING AND INSPECTION
- 6.0 GENERAL SPECIFICATIONS
- 7.0 PRINCIPAL OF OPERATION
- 8.0 FRONT PANEL DESCRIPTION
- 9.0 REAR PANEL DESCRIPTION
- 10.0 LED Indicators
- 11.0 MAKING CONNECTIONS TO THE X75
- 12.0 INSTALLATION
- 13.0 USING THE CONTROLLER WEB BROWSER INTERFACE
- Appendix 1 – SNMPv3 MIB Information
- Appendix 2 – Load LVD (special order)
- Appendix 3 – Revision History
- Figure 1 - X75 Compact Integrated DC Power System
- Figure 2 - Block Schematic
- Figure 3a - Front View with Breakers (configuration A)
- Figure 3b - Front View with GMT Fuses (configuration B)
- Figure 4 - Rear Views of Base and Expansion Units
- Figure 5 - LED Indicators
- Figure 6 - Recommended Load Circuit Wire Sizes
- Figure 7 - Battery Temp. Probe & Alarm Relay Connector Pin-Out
- Figure 8 - Ethernet Connector Pin-Out
- Figure 9 - Auxiliary Connector Pin-Out
- Figure 10 - Input Current Ratings
- Figure 11 - Status WEB Page (typical)
- Figure 12 - Rectifier Status WEB Applet (typical)
- Figure 13 - Installation WEB Applet - system tab (typical)
- Figure 14 - Installation WEB Applet - float & tc tab (typical)
- Figure 15 - Installation WEB Applet - battery tab (typical)
- Figure 16 - Installation WEB Applet - float & tc tab (typical)
- Figure 17 - Installation WEB Applet - lvd tab (typical)
- Figure 18 - Installation WEB Applet - digital i/p tab (typical)
- Figure 19 - Installation WEB Applet - rectifiers tab (typical)
- Figure 20 - Installation WEB Applet - shunts tab (typical)
- Figure 21 - Battery Management WEB Applet (typical)
- Figure 22 - Alarm Matrix WEB Applet (typical)
- Figure 23 - Alarm Matrix WEB Applet - matrix options (typical)
- Figure 24 - Alarm Matrix WEB Applet - temperature alarm settings (typical)
- Figure 25 - Alarm Matrix WEB Applet - voltage alarm settings (typical)
- Figure 26 - Alarm Matrix WEB Applet - voltage alarm settings (typical)
- Figure 27 - Alarm Matrix WEB Applet - other alarm settings (typical)
- Figure 28 - Network Settings WEB Applet (typical)
- Figure 29 - Alarm Log WEB Applet (typical)
- Figure 30 - Data Log WEB Applet (typical)
- Figure 31 - Change Password WEB Applet
- Figure 32 - Help WEB Page
- Figure 33 - About WEB Page (typical)
Page 34
X75 SERIES - Mk3 Controller
INSTALLATION & OPERATING MANUAL
Manual No. x75mk3-11
x75-man-Rev11-0815.indd
EnableScheduledEqualizationcheckbox. Some batteries require equalization
to be applied periodically. Check this check box to enable this feature. Further
parameters must be set up to use this feature correctly.
EqualizationVoltage. The voltage to which the rectiers will be raised to achieve
the boost/equalize function.
Equalizefor. The equalization will operate for this length of time (in minutes)
before dropping back to the oat voltage (with temperature compensation if enabled).
Numberofdaysbetweenequalizations. Set this parameter to determine how often
the equalization function will operate (in days).
Timeof day forequalization. Use the spinners to set the time of day that the
equalization function will begin. This is usually chosen to be an off peak time.
StopEqualizationifchargecurrentexceeds. The equalization or boost will be
terminated if the battery charge current exceeds this value. Equalization will also
stop if the battery temperature exceeds 38°C. (Fixed threshold).
Buttons StartEqualization and StopEqualization may be used to manually start and
stop the equalization process. Once started, the equalization will stop automatically if
any of the above parameters are exceeded (equalization time, equalization maximum
current, battery temperature above 38°C).
Note that it is necessary to enter the administrator or user password to manual start
or stop equalization.
13.3.5-LVD
Figure17-InstallationWEBApplet-lvdtab(typical)