System information
GRAVITAS SABRE SERIES
INSTALLATION &OPERATING MANUAL
Manual No. SABRE-4 Page 48 11/27/07 sabre-man
5
5
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
This section provides the procedures necessary for checking out operation of the system.
5
5
.
.
1
1
S
S
t
t
a
a
r
r
t
t
u
u
p
p
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
Follow steps 1-4 before power up:
1. Check power wiring for errors. Measure inputs and outputs to GND for shorts.
2. Apply 48-60VDC power to the DC input terminal of inverter system.
3. The Inverter system will run after 20 seconds.
Verify if the green LED of Inverter modules, STS module and Controller module are on.
4. During the start up of the system, controller will display:
5
5
.
.
2
2
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
i
i
n
n
R
R
u
u
n
n
n
n
i
i
n
n
g
g
w
w
i
i
t
t
h
h
a
a
C
C
o
o
n
n
t
t
r
r
o
o
l
l
l
l
e
e
r
r
I
I
n
n
s
s
t
t
a
a
l
l
l
l
e
e
d
d
5.2.1 Status & Settings for the System
After 10 seconds the controller will display as follows,
yy-mm-dd hh:mm
I NV OPV: xxx.xV
SMR OPV: xxx.xV
STS MOD: float
Then press “ENTER” key, user can query and set the parameters of system and all modules:
Main Menu
Ź Status
Settings
The green LED on the module will blink while being interrogated by controller.
The LCD display menu structure is given as follows: