System information

GRAVITAS SABRE SERIES
INSTALLATION &OPERATING MANUAL
Manual No. SABRE-4 Page 41 11/27/07 sabre-man
4
4
M
M
e
e
c
c
h
h
a
a
n
n
i
i
c
c
a
a
l
l
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
Installation Equipment
Before installing the Inverter system, ensure the product received contains the components specified when it was
ordered. Contact UNIPOWER Telecom immediately if there is a question about the configuration of the system.
Installation Tools
The tools necessary to install and test the Gravitas SABRE Series Inverter system include cross-head screwdrivers,
torque wrenches, a ratcheting wrench set, wire cutters, etc. No unusual tools are required.
4
4
.
.
1
1
I
I
n
n
v
v
e
e
r
r
t
t
e
e
r
r
S
S
h
h
e
e
l
l
f
f
&
&
I
I
n
n
v
v
e
e
r
r
t
t
e
e
r
r
M
M
o
o
d
d
u
u
l
l
e
e
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
a
a
n
n
d
d
R
R
e
e
m
m
o
o
v
v
a
a
l
l
4.1.1 Inverter shelf Installation
When adding or installing inverter shelves to a plant, proceed as follows referring to Figure 24.
It is essential to shut down the system.
A. Decide where the inverter shelf will be added or installed in the cabinet.
B. Insert the shelf.
C. Secure the shelf with the retaining screws.
4.1.2 Inverter shelf Removal
A. Determine which inverter shelf needs to be removed.
B. Remove the retaining screws.
C. Remove the shelf from the cabinet.
Figure 24 Install and remove inverter shelf
Retaining Screw
Inverter Shelf