4.4.5 HV 3-phase measurement with 3CT’s and 2PT’s (Line-to-line voltages)
Figure 13
The above wiring diagram is used for three-phase measurement in electricity networks with 3 CT´s
and 2 PT’s. The voltage channels of the unit are connected to PT’s (normally 110 V AC secondary),
for supplying line-to-line voltages, and current channels are connected to CT’s (normally 1 - 5 A AC
secondary). Two voltage channels are measured and the third is calculated in the measuring
instrument. Always protect the voltage inputs with a 1A fuse in each conductor (red conductor) on
the secondary side of the PT. The connection for this type of measurement is as follows:
Channel: Measured object: Channel: Measured object:
U1+ = L1-L2 PT+ I1+ = L1 CT+
U1- = L1-L2 PT- (Grounded) I1- = L1 CT- (Grounded)
U2+ = L3-L2 PT- (Grounded) I2+ = L2 CT +
U2- = L3-L2 PT+ I2- = L2 CT - (Grounded)
I3+ = L3 CT +
I3- = L3 CT - (Grounded)
Note: If this method is used, the recorder will automatically calculate the third line-to-line
voltage (U
L3 - L1
). This configuration is normally used in medium voltage networks.
1A
1A