4.4.3 HV 3-phase measurement with 2CT’s and 2PT’s (Line-to-line voltages)
Figure 11
The above wiring diagram is used for three-phase measurement in networks with 2 CT´s and 2 PT’s.
The voltage channels of the unit are connected to PT’s for measuring line-to-line voltages (normally
110 V AC secondary), and the power is calculated in accordance with the Aaron 2-wattmeter
method. The current channels are connected to CT´s (normally 1 - 5 A AC secondary). Two channels
are measured while the third current and voltage are calculated from the measured channels. Always
protect the voltage inputs with a 1A fuse in each conductor (red conductor) on the secondary side of
the PT. The connection for this type of measurement is as follows:
Channel: Measured object: Channel: Measured object:
U1+ = L1-L2 PT+ I1+ = L1 CT+
U1- = L1-L2 PT- (Grounded) I1- = L1 CT- (Grounded)
U2+ = L3-L2 PT- (Grounded) I3+ = L3 CT+
U2- = L3-L2 PT+ I3- = L3 CT- (Grounded)
Note: If this method is used, the recorder will automatically calculate the third line-to-line
voltage (
UL3 - L1
) and the current I2. This configuration is normally used in medium
voltage networks.
Note: In this configuration the constants for U1-U3 must be the same. Also the constants for
I1-I3 must be the same. This is because the missing U2/I2 is calculated by the
instrument.