Installation manual

UNIPOWER
Installation manual PQ Secure
104
12.5 Checklist when adding a meter in PQ Secure
Use this checklist after you have installed a new meter on site and you are adding it to the PQ Secure
system.
1
Configuration of each meter in PQSecure
OK
Comments
Technician:
Contact: _________________________
E-mail: _________________________
Telephone: _________________________
Customer/company information:
Installation date:
1.0
Click the Tools tab in PQ Secure, choose “Manage Licenses” and add the license for the meter.
1.1
Right click the database and log in as admin
1.1.1
Right click the “Meters” folder and choose “Create New Measure Site…”
1.1.2
Fill the site name, meter serial number, nominal frequency, voltage, reference current and the
ratios (compare the entered value to the installation checklist). If there are further fields in the
“Meter Information” tab you can fill, do so.
1.1.3
In the “Communication” tab choose the communication method (RS232, Ethernet, modem etc)
and configure the available settings. Set the download segment size (200Kb is highly
recommended),
The location and information tab is strictly information for yourself. In the Meter config tab you
can read the current configuration in the meter. (This is only available after first download)
1.1.4
The Time Zone Settings is highly recommended that you leave as is. If there are certain
requirements regarding time zones you may configure this here.
1.1.5
When your desired settings are configured click Add. The meter is now added and can be seen
under the “Meters” tab in the left side of PQ Secure.
Download schedule
1.2
Right click the meter that you just added and choose “Add download schedule(s)…”
1.2.1
Set the next time of action, the interval, the port and the command. Set the command to
“Download data” unless you only wish to download the meters data only once.
Normally once per day is recommended. Dispense the downloads between 00 and 07 when the
load on the server is low.
Always initiate the download in the middle of a storage interval. Example: if the storage interval
is 10 minutes, initiate download at xx hours 05 minutes.
1.2.2
Test the schedule by right-clicking on it and select download now.
1.3
Email list, reports and alarms
1.3.1
(optional) Add alarm for sag/swell. Email to mail list.
1.3.2
(optional) Add weekly report. Email to mail list.
1.3.3
(optional) Add monthly report. Email to mail list.
1.3.4
(optional) Add quarterly report. Email to mail list.
1.3.5
(optional) Add yearly report. Email to mail list.
For each report choose to “Edit MailList” and add a new email list with the users specified.
The above points have been processed: Date: ____/____- ______
Installation performed by: _____________________ Installation approved by: ______________