Installation manual

UNIPOWER
Installation manual PQ Secure
103
1.4.15
Select suitable U4 transient trig. Recommended trig/Uref=50%
Channel I4
1.4.16
Is I4 used? YES ________ NO ________
2
Check the connection/wiring
2.1
Check vector diagram. The voltage phase sequence should be
U1 red (0°) U2 green (-120°) U3 blue (+120°)
2.2
Check vector diagram. Each current should be within +/-90° from its
corresponding voltage
2.3
Check that PF is >0.7 on all phases as well as total
2.4
Check that P is positive for each phase (if not measuring on a generator)
2.5
Check that unbalance is low (high value means wrong phase sequence)
2.6
Select transfer data a few times. Cancel the transfer and verify that there isn’t a
continuous trigging of sag/swells or transients due to bad settings.
2.7
Erase all old data in the meter
2.8
Set the correct time in the meter
The above points have been processed: Date: ____/____- ______
Installation performed by: _____________________ Installation approved by: ______________