Installation manual

UNIPOWER
Installation manual PQ Secure
102
1.2.3
Modem
PSTN ISDN GSM
Phone no:
1.2.4
GPRS/3G Modem
Unit IP:
Port number: _________________
1.3
Configuration
1.3.1
State type of wiring connection:
1) Single phase
2) 3 wire 2CT 2PT
3) 3 wire 3CT 3PT
4) 4 wire
5) 3 wire 2CT 3PT
6) 3 wire 3CT 2PT
1.3.2
Channel
Reference
voltage/current
Transformer ratio
U1
U2
U3
U4
I1
I2
I3
I4
1.4
Configure using PQ Online
1.4.1
Set suitable storage intervals (10 min except 120 min PLT and 60 min Power
Harmonics, 60 min power)
1.4.2
Sag/swell trig U1-U3: 10%
1.4.3
Sag/Swell record time: 2,5 s
1.4.4
Sag/Swell pretrig: 100 ms
1.4.5
Sag/Swell waveform 16 points/cycle
1.4.6
Sag/Swell hysteresis 2%
1.4.7
Sag/Swell sliding reference if meter is connected to MV or HV. On LV fixed
reference is usually preferable.
1.4.8
Transient trig U1-U3: 50%
1.4.9
Harmonics: 50
1.4.10
Harmonics: phase angles: 0
1.4.11
Flicker 120V if LV-grid is 120V nominal otherwise always 230V
1.4.12
Set the time in the meter (View -> Unit Status -> Set Time)
Channel U4
1.4.13
Is U4 used? YES _____ NO ____ If NO, skip to 2.0.
1.4.14
Select suitable U4 sag/swell trig. Recommended trig/Uref=10%
If ground fault monitoring select ca 10% of nominal voltage.
Note! Value is stated in Volts.