Installation manual
UNIPOWER
Installation manual PQ Secure
101
12.4 Meter Installation Checklist
Use this checklist when you install a new meter on site.
1
Configuration of meters
OK
Comment
For each meter, complete the following section
Technician:
Contact: _________________________
E-mail: _________________________
Telephone: _________________________
Customer/company information:
Installation date:
1.0
PQ Secure installation CD version:______________
1.1
Information about meter:
Meter name: ________________
Serial no: ________________
Tel. no (modem): ________________
IP-address (local): ________________________________________
Location: ________________
Location label: ________________
Line: ________________
Bus bar: ________________
Group: ________________
Cabinet: ________________
Voltage level (primary/secondary): ________________
Supply voltage: _______________ ☐ AC ☐ DC
Supply voltage protection (UPS): ☐ Yes ☐ No
☐
1.2
Installed communication equipment
1.2.1
Ethernet
Unit IP:
Gateway:
Subnet mask:
☐
1.2.2
RS-232
BPS rate:
☐