Installation & Assembly
Assembly Steps
Overview
Left Seat Base Panel
(A)
Right Backrest
Left Backrest Frame
(H)
Middle Backrest
Frame (J)
Horizion Bar
(K)
Verticle Bar
(L)
Lower Backrest Panel
(M)
Upper Backrest
Panel (N)
Left Seat Base Panel
(B)
First Support Bar
(C)
Feet Block
(E)
Second Support Bar
(D)
Feet Base Panel
(F)
Seat Frame
(G)
Right Backrest
Frame (I)
This Sun Lounger has multiple parts and may require up to 30 minutes to assemble. To give you an
overview of the Bench, the above picture is to help you put the various parts into perspective. Please
read through the instructions below to familiarise yourself with the parts and steps before assembly.
Cushion
(O)
FRONT FACING
read through the instructions below to familiarise yourself with the parts and steps before assembly.
4








