Instruction For Assembly
Table 1 – Complete set of details
№
поз.
Наименование детали Размер, мм
Кол-
во,
шт.
1 Back board shelf 1498х250х16 1
2 Horizontal board shelf 1498х200х16 1
3 Level 1498х62х16 1
Table 2 – Complete set of accessories
Assembly sequence
! Dowels (A-01) are inserted only after PVA glue has
poured in openings.
! Free part of the inserted dowel (A-01) shouldn't act
concerning a detail end face more than on 12 mm.
1. In openings of Ø35 mm on back face of a
detail (1) insert adjustable shed (Q-01).
2. In openings of Ø8 mm in the end face of a
detail (2) – insert dowels (А-01) according to the picture
1.
3. In openings of Ø5 mm on face of a detail (3)
twist screws of eccentrics (С-01) according to the picture
2.
4. In openings of Ø15 mm on face of a detail (2)
– insert eccentrics (В-01) according to the picture 1.
5. Fix a horizontal board shelf (2) to a back
board (1) by means of confirmees of Ø7x50 mm (O-02)
and key of confirmee (R-01) according to the picture 3.
6. Attach a level (3) to the received above
design. Clamp the connecting them eccentrics (В-01)
(picture 4).
! If necessary adjustment of corners of the shelf in the
direction is possible up-down. For this purpose turn
the screw in the center of a loop of adjustable (Q-01)
to the right or left side, thereby raise or let down the
right or left corner of the shelf.
! THE SHELF IS COLLECTED AND READY FOR
OPERATION
О-02 х 5
Ø7х50
Р-01 х 1
Q-01 х 2
C-01 x 5 B-01 x 5
A-01 x 8
Ø8х35
1
2
3
1
4
9
8
250
2
1
6
62
Р-01
О-02
В-01
А-01
B
15 мм
С-01
B
5 мм
picture 1
picture 2
picture 3
picture 4